IoT Solutions.
From sensor to insight — telemetry ingestion, edge compute, digital twin and real-time analytics for physical operations.
Where bits meet atoms.
IoT only delivers when the loop closes: sensor → event → decision → action → outcome. We've built that loop for manufacturing, housing (smart meters), logistics and retail — with the governance, safety and observability that operational-grade systems require.
Partners with our Engineering Services practice (embedded and semiconductor) means we can go all the way down to the device firmware where needed.
Where we help.
Sensor & telemetry integration
Industrial protocols (OPC-UA, Modbus, MQTT), consumer IoT, LPWAN (LoRaWAN, NB-IoT).
Edge computing
On-device / gateway processing for latency, cost or connectivity constraints.
Digital twin
Operational model of the physical estate, synchronised in near-real-time, queryable and simulatable.
Real-time analytics
Streaming pipelines, anomaly detection, operational dashboards.
Device management
Fleet operations, firmware OTA, security monitoring, lifecycle management.
Safety & resilience
Fail-safe design, offline operation, incident handling — operational-grade concerns.
Pilot to fleet.
Pilot
Small fleet, end-to-end value chain, measurable outcome.
Harden
Safety, resilience, security, observability at operational grade.
Scale
Fleet rollout, device management at scale, operational integration.
Operate
Managed service or capability hand-over.
- ✓Device-to-cloud pipelineIngestion, processing, analytics, visualisation.
- ✓Edge applicationWhere latency / cost / connectivity require it.
- ✓Digital twinOperational model with simulation capability.
- ✓Device management platformFleet, firmware, security, lifecycle.
- ✓Operations runbookSRE for physical systems.
- ✓Business-case evidenceOEE, downtime, consumption, safety — before/after.
Tools & frameworks we use.
A real engagement.
Manufacturer — OEE lift of 9.2pp across 4 plants.
IoT across OPC-UA lines, edge anomaly detection, real-time OEE dashboards and closed-loop shift optimisation. 9.2pp OEE improvement across four plants within 10 months.
Read full case study